In prefabricated construction, building components are constructed in a factory and shipped to the construction site, where they are then assembled to complete the structure. Construction in a factory allows completion of building components in a controlled environment that is clean and dry.
Imagine building a room the traditional way and having to lay each individual brick, versus ordering a fully constructed room. This is what it means to buy a prefab home, or other readymade houses.
This guide covers how prefab construction works, costs involved, where India is with respect to prefabricated construction, and how to find the right supplier.
What is prefabricated construction?
Prefabricated construction is a method of building where Factory-made components are shipped to the building site, and assembled to complete the structure.
Elements made from prefabricated construction include:
- Ready-made homes and other types of buildings
- Office cabins
- Security and Toll cabins
- Bunk houses
- Prefab and Container houses
- Steel and other types of prefab structures
How does prefabricated construction work?

The process has five steps and the main time saving is achieved by building two parts of the structure simultaneously.
The foundation is being poured on site, while the components of the building are being constructed in the factory.
Design and Approvals
The design of the building is finalized and approvals are obtained at this stage.
Factory Construction
The steel frame and other elements of the building are constructed and joined in a factory.
Quality Checks
Inspections are carried out to ensure quality of the units before they are shipped.
Transport
Trucks carry modules, and larger modules are transported via trailers.
Assembly
Units are placed and connected to one another via bolts. Power and water are connected.
The Modular Building Institute (MBI) states that 60-90% of a modular building is fabricated in the factory.
What are the main types of prefabricated construction?

There are many ways of defining prefabricated construction, and often projects use more than one method.
There are five main types and many variations of each:
- Panelized: wall, floor and/or roof panels made in a factory and joined on site.
- Modular: complete rooms and/or modules fabricated in the factory and often include fittings.
- Precast Concrete: beams and/or slabs and/or wall panels of concrete made in a yard or factory.
- Steel: pre-engineered frames for sheds and/or warehouses and/or factories.
- Container and Cabin builds: Modified shipping containers and/or MS cabins.
Each of these methods is best suited for a different project. A warehouse is best suited for steel, while a site office may be a cabin.
Looking for Reliable Prefabricated Building Solutions?
Explore prefabricated office cabins, container houses, bunk houses and modular structures designed for different commercial and industrial requirements.
What are the advantages of prefabricated construction?
The main advantage of prefabricated construction is the shortened construction time. The research backs this up:
Time: McKinsey states that using modular methods can shorten the time required by 20-50% and the MBI states that savings can be 30-50%.
Cost: McKinsey states that using modular methods can decrease the cost by up to 20% with a risk of an increase up to 10% if there are challenges with the logistics and/or material.
Waste: WRAP, a body in the UK, states that using prefabricated methods can decrease waste by up to 90% for timber, cardboard, plastics and concrete.
Labour: McKinsey states that using modular methods can decrease the required on-site labour by 10-25%.
Weather: Most work happens indoors so a monsoon week doesn’t really affect production.
Market: Under reasonable assumptions, McKinsey anticipates the modular building construction market in the US and Europe to be worth $130 billion by 2030.
Is prefabricated construction cheaper than traditional construction?
Usually, yes. Shorter construction times, fewer workers on site, and less waste result in cost savings.
Increased transport costs and design costs decrease savings. McKinsey’s analysis (as summarized by Consultancy.uk) suggests that moving modules to a site increases the overall cost of construction by 2-10%.
The final cost of a prefabricated house depends on:
Size and layout
Material of frame and wall (e.g. MS, GI, container steel)
Type of wall insulation
Electrical and plumbing fittings
Distance from factory to site
The cost of a basic prefabricated cabin in Mumbai depends on its size, materials, specifications and installation requirements. There is a large price difference for the same level of construction in other countries. A line-by-line quote gives the best comparison.
Where is prefabricated construction best utilized?
Where designs need to be repeated, tight deadlines are required, and/or hard to reach sites. Prefabricated designs are particularly suitable for repetitive, modular structures
Construction sites: Temporary buildings for offices, stores, and employee housing.
Remote Industrial Sites: Guard rooms and canteens.
Curved walls and random stonework don't lend themselves well to repeatability. Factories thrive when the same module repeats.
How is prefab construction done in India?
The use of factory-built homes, steel buildings and portable cabins is widely seen in the various housing schemes, industrial sites and construction sites in India. Some government initiatives also helped boost the sector.
The Ministry of Housing and Urban Affairs launched the Global Housing Technology Challenge-India in 2019 and shortlisted 54 technologies.
Light House Projects were set up in six Indian cities, namely Indore, Rajkot, Chennai, Ranchi, Agartala and Lucknow. Every Light House Project is an example of the application of advanced building technologies.
According to the information provided by the Ministry of Housing and Urban Affairs in July 2025, five Light House Projects in Chennai, Rajkot, Indore, Lucknow and Ranchi have been commissioned, whereas the Light House Project in Agartala is nearing completion.
All the above mentioned projects exemplify the way in which modern building technologies could contribute to efficient and sustainable construction of houses in India.
Is prefabricated construction eco-friendly?
By nature, it can be eco-friendly, as it reduces site work and wastes fewer materials. How eco-friendly it is really depends on the project and what materials are used.
Emissions: MBI's research summary reports that modular building caused about 30% less greenhouse gas emissions on average, compared to on-site building.
Materials: Modular buildings in general, used about 20% less materials, according to MBI's research.
One project: Modular reduced the schedule by 4 months and reduced CO2 emissions by 43%.
Using a container saves steel, but insulation and conversion add impacts. To call any build green, look at the big picture.
Prefabricated Construction vs Traditional Construction
From the perspective of speed and waste, prefabricated construction is better than traditional construction. Traditional construction is better than prefabricated construction, when it comes to design freedom.
Schedule: Prefabricated construction divides work over the factory and the site, whereas in traditional construction work is done in sequence.
Quality: Construction in a controlled environment (factory) is better than construction on an open site (e.g. a building site) which is exposed to varying weather conditions and is reliant on the construction workforce.
Waste: A construction plan tells a factory what to cut, where, and how. Site cutting is often unplanned.
Design: Traditional construction is better to handle design complexities and late changes.
Site conditions: Only a truck and crane are needed for prefabricated construction, whereas a level base is needed, and the site may have restricted access.
What are the limits of prefabricated construction?
Even if the market for prefabricated construction is expanding, this is not the case everywhere. So, before you order a prefabricated building, consider some of the restrictions that still apply.
Transport limits: The width and height of the road, and the rules of bridges, still limit the size of the modules.
Late changes: Changes after fabrication result in extra costs.
Foundations: Each module still requires a level, and a prepared base, and the cost for this is usually not included in the cabin price.
Approvals: Local rules, land use, and permits still apply to your plot.
Quality: Two cabins at the same price can vary greatly, in the steel and insulation used.
How do you evaluate a prefabricated construction supplier?
Pick a supplier that lets you see their factory and work. Photos alone are not enough. Ask who will do the site installation. Get a copy of the warranties. Don't pay a deposit until you get the information you need.
Use this checklist:
- Ask for frame, panel, and insulation specs.
- Check electrical and plumbing fittings.
- Get delivery and installation terms.
- Check warranty terms.
- Ask how the unit will be delivered to the site, and if a crane will be needed.
- Check if they have done similar projects.
- Ask for terms of each quote.
Ascent Porta Solutions has been in business in Mumbai since 2016 and makes cabin style prefabricated constructions for offices, guard rooms, toilets, bunk houses, accommodation cabins, capsule homes, container houses, and used shipping containers.
Planning a Prefabricated Construction Project?
Get expert assistance in selecting the right cabin or modular structure based on your project requirements, available space and intended application.
FAQs
What is prefabricated construction?
It involves manufacturing and then putting together building components at a factory and site.
How much faster is a prefabricated house built compared to a conventional house?
According to McKinsey & MBI there is an estimated 20-50% reduction in time as both site and off-site work can occur simultaneously.
Are prefab houses as strong and secure as conventional properties?
Yes. They are built to conform with local regulations and are also checked for quality.
How much does a house cost to build using the pre-fabrication method in India?
While it is not clear exactly how much this will cost, a quotation can be provided depending on your requirements.
What is the difference between pre-fabrication and modularity?
While pre-fabrication involves factory manufacture of building components, modularity is a sub-type of pre-fabrication which builds entire room sections.
Can mobile cabins and containers be relocated?
Yes. They can be moved by crane to a different site however the base remains at the original site.
Get a Quote for Your Prefabricated Building Project
Whether you need an office cabin, security cabin, bunk house, container house or customised prefabricated structure, Ascent Porta Solutions can help you find a suitable solution.